Cup of Joe - Continuity of Control Layers

Pretty easy…just connect the water control layer of the roof, wall and foundation to each other…the air control layer of the roof, wall and foundation to each other…vapor control layer of the roof, wall and foundations to each other…and the thermal control layer of the roof, wall and foundations to each other.  Then it gets complicated…punched openings like windows and doors…  It gets worse…decks...

Cup of Joe - Second Law of Thermodynamics

This is most important of all the laws of thermodynamics….

Of course the crazy way we speak about the Second Law does not help: “In an isolated system, a process can occur only if it increases the total entropy of the system.” Huh? It makes you want to hate Rudolf Clausius. Couldn’t he just say that heat goes from warm to cold?1 Most of us get the heat goes from warm to cold thing. It’s the other simple applications of the Second Law that we miss:

• moisture goes from warm to cold

• moisture goes from more to less

Even More Airtightness!

So where are we after a half century? We went from the interior to the exterior with air barriers. And we went from combining the vapor barrier with the air barrier on the inside to combining the water control layer with the air barrier on the outside. We went from films on the inside to sheet goods on the inside. Then we went from films on the outside to sheet goods on the outside. We went from caulking and the black death on the inside to tapes and fluid applied joint systems on the outside. We are not done of course. But we are well on the way.

Airtightness - How did we get here?

Things have evolved considerably since the Eisenhower and Diefenbaker years. Hutcheon taught us about air flow that decade but it took more than a half century to get it right. We needed air control. We needed an air control layer – an air barrier. We started off with locating it on the inside, moved it to the middle, and finally ended up with it on the outside3. We started by combining it with a vapor barrier on the inside then we finished by combining it with a weather resistive barrier (WRB) and continuous insulation on the outside.

Rain Screens

We have learned to add holes and drainage in tall buildings in order for them to work. The lesson learned in tall buildings is that we can’t keep the rain out so we drain it out after it has entered. We can reduce the amount that enters but we can never completely keep it all out. Drainage and holes are key. These are regularly installed in tall buildings but not in short buildings. Until we add holes and drainage to small buildings they will continue to leak. This is so counter-intuitive that it borders on magic.

Capillarity in Concrete and Wood

One moisture transport mechanism that is often overlooked in building construction is capillarity or capillary suction.  Capillary suction acts primarily to move moisture into porous materials.  For example, a paper towel, with one end in contact with liquid water, draws water into itself against the force of gravity as a result of capillary suction.  

Below-Grade Waterproofing and Water Control

It is pretty weird to dig a big hole and drop a building into it.  A one story house with a basement is really a two story house that you dropped into the ground burying one story.  Think about it…now you have to make the part in the ground strong enough to keep the dirt out.  Even more difficult you have to keep the water out.  Oh yeah, you also have to keep the soil gas out.  It is kind of dumb to try to install windows.  What are you going to look at?  Worms?  So you surround the windows with vertical shafts in an attempt to connect them to dayligh

Open-Joint Cladding Systems

The basis of the current ongoing Canadian Civil War between pressure equalization and ventilated and drained claddings (open-joint cladding systems). Old school engineers like me were taught by Old Masters like Handegord who pointed out that drainage was the key to life in general and pressure equalization—if it applied at all—was for joints and not for entire wall assemblies. Claddings were to be drained.  Ventilated if you must, but first and foremost they had to be drained.